The drillship Noble Gerry de Souza (NGdS) and the land rig Bembu 1 are scheduled to join the current fleet of 54 rigs active in the Nigerian oil patch before June 2026, bolstering a busy, basin- wide rig site activity that had zoomed off in the Niger Delta since 2024.
The national rig schedule indicates that ExxonMobil has lined up 16 wells from July 2026 to September 2027. They are all infill wells, planned to be drilled by NGdS.
Amni International has returned to drilling after a six year hiatus, using the Shelf Victory to, according to plan, drill three wells on the Okoro field, all sidetracks.
The US major Chevron and the Indian operator SEEPCO, are expected to be the busiest with the drill bit.







