tender - Africa’s premier report on the oil, gas and energy landscape.

All posts tagged tender


Advert For Tender Opportunity Hire Of 2000hp 10ksi Land Rig

Aradel Energy Limited.

1. INTRODUCTION

Aradel Energy Limited intends to hire a 2000HP 10KSI Land Drilling Rig for the drilling, completion and testing of Land Wells with an anticipated starting date from July 2024 for a one year firm period plus two-year optional extension.

Aradel Energy Limited. therefore uses this medium to inform suitable and reputable Companies having requisite experience, Drilling Rig available and resources for the execution of this scope to submit their proposals for consideration in the subject opportunity.

2. SCOPE OF WORK/SERVICE REQUIREMENT

The scope of work will comprise of Drilling, Completion, Testing, De-completion, Recompletion and Suspension of Wells in the Aradel Energy Limited concession areas (OML 53 & 54) on Land on a 24hours/7days basis.

The scope includes;

  • Mobilization from point of Origin to first Well site.
  • Demobilization of Rig from last operational location.

The requested Rig should be fully capable of working in Nigeria Land Operational condition, with minimum negative impact on the environment and strict compliance to Health and Safety of all concerned in the activities.

The Rig shall have a minimum mandatory requirement of the listed basic capability/equipment to qualify for consideration;

  • Rig shall be mobilized in Q3 2024
  • Rig Hoisting capacity: 1,000,000 pounds (450 metric tons).
  • Drawwork Power: 2,000 horsepower.
  • Top Drive Torque: 100,000 ft-lbs of torque.
  • Mud Pumps: Multiple pumps with a combined capacity of 7,500 to 10,000 horsepower.
  • Rotary Table Torque: 350,000 to 500,000 ft-lbs.
  • Derrick Height: 180 feet tall.
  • BOP System Pressure Rating: 10,000 psi.
  • Power Generation: 4 diesel generators, totalling 3,000 to 5,000 kW.
  • Pipe Handling Equipment: Automated systems capable of handling drill pipe lengths up to 45 feet.
  • Safety Systems: Comprehensive fire and gas detection systems, with ESD systems and safety interlocks.
  • Well Control Equipment: Choke manifold rated for 10,000 psi, with kill lines and diverter systems.

3. MANDATORY REQUIREMENTS

To be eligible for this tender exercise, interested contractors are required to be registered in the NUPRC and NCDMB databases.

Interested Contractors are required to send this information and the specifications of the Rig to Rigbids@aradel.com within two working days of this advert to receive an Invitation To Tender (ITT).

4. NIGERIAN CONTENT

Bidders are invited to express complete understanding, willingness and commitment to comply with the Nigerian Oil and Gas Industry Content Development (NOGICD) Act, 2010 and Insurance ACT 2003.

Consequently, Bidders submissions shall be evaluated strictly with the minimum evaluation criteria defined in the NOGICD Act.

Bidders shall:

  1. Take note that this contract shall be bided exclusively by only Nigerian indigenous service companies having verifiable Nigerian equity shareholding of 51% and above.
  2. Demonstrate that the entity is a Nigerian indigenous company. Provide details of its Ownership Structure. Submit certified true copies of CAC form (CAC2A and CAC7A) including Memorandum and Article of Association.
  3. Provide evidence of completed registration on NCDMB’s NOGIC JQS portal.
  4. A detailed description of the location of in-country committed facilities and infrastructure (assets, equipment, technical office, administrative space, storage, etc.) in Nigeria to support this contract.
  5. Demonstrate minimum of 50% Nigerian ownership of rig equipment planned to be engaged.
  6. Provide Memorandum of Agreement (MOA) with the Nigerian entity that will carry out minor/major maintenance for the duration of the contract.
  7. In line with the relevant provisions of the NOGICD Act, 2010 and the NCDMB approved rig utilization strategy, the Bidder shall demonstrate substantial evidence of utilization and Nigerian ownership of Land Rig or Nigerian-equity acquisition within the nominated LAND RIG or any other drilling rigs (land/swamp, etc.) (or providing MOA for a rig owned by a Nigerian 3rd party). Bidders shall provide NCDMB Rig Certification to support equity/ownership of rig should submit same as supporting evidence.
  8. Bidders to provide a detailed manning organogram for the nominated rigs showing 70% by man-hours of the personnel positions and manning level onboard the nominated rigs to be occupied by Nigerian national employees.
  9. Provide evidence of what percentage of its key management positions are held by Nigerians and what percentage of the total work force are Nigerians and show overall percentage of work to be performed by Nigerian resources relative to total work volume.
  10. All sub-contractors to the Drilling Rig Contractor must have valid Category “SS” NCEC for Drilling Services & valid Category “DA” NCEC for other support services such as Catering, Housekeeping etc.
  11. Evidence of 1% NCDF payments (inclusive of subcontracts) for all past project executed by the Bidders (and Rig owner) in the Nigerian oil and gas industry.
  1. Submit a detailed training plan which shall provide sustainable training and development (including certifications as applicable) for Nigerians in line with the Human Capacity Development Initiative Guideline of the Nigerian Content Development and Monitoring Board (NCDMB). The training plan will include contract-specific training and estimated man-hours. Tenderer is required to submit MOA with Oil and Gas Trainers Association of Nigeria (OGTAN) trainers to support their training plan, which shall be 15% of the project Man-hours of 3% of the total contract sum.

 NOTE: Non-compliance with Nigerian content requirements and failure to have a Rig available by the planned start date are FATAL FLAWS

 CLOSING DATE

The Bids shall be submitted on the Aradel Energy Ltd. portal at www.aradel.com/sharepoint on or before Friday, the 10th of May 2024 being the bid closing date.

 ADDITIONAL INFORMATION

This advertisement of “Tender Opportunity” shall not be construed as a commitment on the part of Aradel Energy Ltd., nor shall it entitle Applicants to make any claims whatsoever and/or seek any indemnity from Aradel Energy Ltd.  and/or any of its Affiliates or Partners by virtue of such Applicants having responded to this Advert.

As Rig mobilisation is planned for Q3 2024 and the requirement is for a Heavy Rig, the Rig must be available in country by this date, ready for mobilisation and the HP range from 2000HP or higher. Bidders that do not meet these criteria need not tender for this service.

NCDMB Certification of Authorisation no. ES/NCDMB/ARADEL/ADV/IPPG/130424/HIRE OF ONE (1) 2000HP LAND DRILLING RIG

 


CALL FOR APPLICATION 2023/2024 ACADEMIC YEAR

Postgraduate Programmes in Petroleum and Energy Studies
FUPRE Energy Business School, Effurun, Warri
NIGERIA

Model: Modular
Duration: 12 Months
BOP: 012023or072023
ECP: $500perModule

Facilitator:
Wumi Iledare, PhD
Professor Emeritus & Executive Partner,
PetroNet-Africa Network of Petroleum and Energy Experts (PANofPEE)
WhatsApp +2348057657494
info@petronetafrica.com

  • The Federal University of Petroleum Resources calls for applications for admission into its innovative and interdisciplinary postgraduate programme in its FUPRE Energy Business School. The new programme is timely and relevant as the global energy landscape evolves.

The FUPRE Energy Business School offers professional Masters and Doctorate degrees in Petroleum and Energy Studies, which are consistent with the mandate of the Federal University of Petroleum Resources to build workforce capacity, sharpen the skills of professional talents, provide the requisite managerial skillsets, and stimulate the application of analytical tools in managing the Nigeria petroleum and power sector.

Doctorate Programme in

Petroleum and Energy Studies 

The professional Doctoral degree in Petroleum and Energy Studies programme has three degree options: Doctor in Petroleum Economics and Management, DPEM; Doctor in Energy Economics and Management, DEEM; and Doctor in Sustainanle Energy and Management, DSEM.

The Doctoral Programme of seeks to:

      • Equip students with good understanding of the philosophies, theories and concepts underlying the economics and management of petroleum, energy resources, and power industries in the energy transition era.
  • Build the capacity of professionals in essential applied research skills for the development, implementation, evaluation, and management of petroleum and energy policy interventions;
  • Engage students with leadership, communication, team-building and simulation skills to facilitate the management of petroleum and energy resources to maximize investment returns and policies for sustainable national development; and,
  • Equip students with the appropriate skills and tools for scientific research in the petroleum and energy sector to appraise policy and global best practices.

Masters in Petroleum and Energy Studies Programme:

The professional Masters in Petroleum and Energy studies aim to produce graduates with strong skillset for analytical and critical thinking, managerial decision-making and advocacy with respect to policy formulation, investment decision analysis, petroleum, energy economics, management and policy. There are three areas of specialisations.

Master in Energy Economics and Management, MEEM.

The MEEM programme seeks to equip:

  • Students with critical knowledge and skills underlying the management and development of Energy resources for national development;
  • Students with essential skill-sets for the development, implementation, evaluation and management of energy policy interventions;
  • Students with leadership, communication, team-building and simulation skills to facilitate the management of energy resources to maximize investment returns and policies for sustainable national development.
  • Students with practical and vocational skills that defines hands-on status of the programme.

Master in Petroleum Economics and Management, MPEM.

The MPEM programme aims to:

  • Provide students with essential knowledge and skills for effectively managing and developing petroleum resources to contribute to national development.
  • Equip students with the necessary skill sets for formulating, implementing, evaluating, and managing interventions in petroleum policy.
  • Foster leadership, communication, team-building, and simulation skills in students to enable the effective management of petroleum resources, optimizing investment returns, and implementing policies for sustainable national development.
  • Instill practical and vocational skills in students that reflect the hands-on nature of the program.

Master in Sustainable Energy and Management, MSEM

The MSEM program aims to:

  • Provide students with crucial knowledge and skills foundational to the management and development of sustainable energy resources for national development.
  • Equip students with essential skill sets for the development, implementation, evaluation, and management of interventions in sustainable energy policy.
  • Foster leadership, communication, team-building, and simulation skills in students to facilitate the effective management of energy resources, optimizing investment returns, and implementing policies for sustainable national development.
  • Instill practical and vocational skills in students that characterize the hands-on nature of the program.

Principal Facilitator:
Omowunmi Iledare, Ph.D
Professor Emeritus in Petroleum Economics and
Executive Consultant and Director, PNA Network of Petroleum & Energy Experts, WhatsApp: +2348057657494

For more information Contact:
Secretary,
Mrs. Ibomo, Jacqueline. +2348039399995. ibomo.jacqueline@fupre.edu.ng

Click Here To Submit Your Interest

 


Invitation For Expression of Interest In The Construction of A Residential Area At The Ogbele Field Logistics Base

1. INTRODUCTION

Aradel Energy Ltd. (www.aradel.com) operator of the Ogbele Marginal Field invites interested companies with relevant brownfield project/construction experience, to make a submission of an expression of interest in the execution of the above facility.

2. SCOPE OF WORK

The primary objective of the project is to develop standard residential accommodation, with other amenities, in Ogbele marginal field. The scope of work will comprise the construction of the following amongst others:

  1. Living accommodation
  2. Recreational facilities
  3. Facility management offices
  4. Library
  5. Helipad
  6. Sewage treatment plant
  7. Security accommodation
  8. Administrative building
  9. Water treatment facilities

The work is expected to be completed in 18 months.

3. MANDATORY REQUIREMENTS

To be eligible for this tender exercise, interested contractors are required to be registered on the Nigerian Upstream Petroleum Regulatory Commission (NUPRC) and Nigerian Content Development and Monitoring Board (NCDMB) service databases and provide evidence of such registration together with the underlisted information/documents for consideration:

  1. Detailed list of experience in delivering engineering, procurement, construction and commissioning of non-oil and gas infrastructure or large scale residential facilities executed in the last 5 years, giving names of clients, location and cost of the project;
  2. Detailed list, with evidence of ownership, of plant and equipment owned by the contractor that is relevant to the provision of the services, indicating age;
  3. Current tax clearance certificate;
  4. Audited accounts for the last three years (2022, 2021 and 2020) and management accounts for the current year;
  5. Technical Partnership/alliances/ Joint Venture proposal including evidence of agreement with partners with respect to the contract scope clearly defined (if applicable).
  6. Compliance with the minimum Nigerian content requirements as set out in the paragraph below.

4. NIGERIAN CONTENT

Interested Contractors are invited to express complete understanding of and willingness and commitment to comply with the Nigerian Oil and Gas Industry Content Development (NOGICD) Act, 2010 and Insurance ACT 2003.

Consequently, bidders’ submissions shall be evaluated strictly with the minimum evaluation criteria defined in the NOGICD Act.

Interested Contractors shall:

  1. Demonstrate that the entity is a Nigerian indigenous company. Provide details of its Ownership Structure. Submit certified true copies of CAC form (CAC 2A and CAC 7A) including Memorandum and Article of Association and CAC status report.
  2. Provide evidence of completed registration on NCDMB’s NOGIC JQS portal and NUPRC (NUPRC oil and gas industry service permit).
  3. Provide a detailed description of the location of in-country committed facilities and infrastructure (assets, equipment, technical office, administrative space, storage, etc.) to support this contract.
  4. Provide a Nigerian Content Plan with detailed description of the role, work scope, man-hours and responsibilities of all the Nigerian companies and personnel that will be involved in executing the work.
  5. Provide evidence of what percentage of its key management positions are held by Nigerians and what percentage of the total work force are Nigerians. And show overall percentage of work to be performed by Nigerian resources relative to total work volume.
  6. Ensure that all sub-contractors have valid NCEC Category “EC” or “DA” for Construction Equipment.
  7. Provide evidence of 1% NCDF payments (inclusive of subcontracts) for all past project executed by the Contractor in the Nigerian oil and gas industry.
  8. For Engineering Design Scope tenderer must have a valid COREN license or an MOA with an Engineering Company with a valid license.
  9. In line with the NCD Human Capacity Development Initiative, Tenderer shall COMMIT to providing Project-Specific training, man-hour, budget, skill development and understudy plan for Nigerian personnel utilizing OGTAN registered trainer(s) or other approved NCDMB training institution(s). The training plan shall be 3% of the total contract sum in line with NCDMB HCD Guidelines (see NCDMB website for more details).

NOTE: Non-compliance with Nigerian content requirements & failure to meet the mandatory requirements stated above are FATAL FLAWS

  1. CLOSING DATE

The Expression of Interest document in electronic copy (PDF format) by e-mail to tender@aradel.com with “Confidential Expression of Interest for the construction of RA at the Ogbele FLB” – in the subject line not later than November 9th, 2023 being the closing date.

  1. ADDITIONAL INFORMATION

This is not an invitation to tender. Full tendering procedures will be provided to applicants who are successful at this expression of interest, in accordance with the pre-qualification procedures.

This advertisement of “Invitation for Expression of Interest” shall not be construed as a commitment on the part of Aradel Energy Ltd., nor shall it entitle Applicants to make any claims whatsoever and/or seek any indemnity from Aradel Energy Ltd and/or any of its Affiliates or Partners by virtue of such Applicants having responded to this Advert.

This expression of interest is a simple invitation to interest in the indicated work scope and does not warrant any further feedback from Aradel Energy Ltd. hereafter. If you do not hear from Aradel Energy Ltd. within 3 months of submission, it should be taken that your application was not successful.

NCDMB CERTIFICATION NUMBER: ES/NCDMB/ARADEL/ADV/IPPG/121023/OGBELE FIELD LOGISTICS BASE ACCOMODATION (OFLBA) DEVELOPMENT PROJECT


NAMIBIA Launches Tender for EPC contract for 40 MW Biomass Power Station

NamPower, the Namibian state electricity utility, is seeking bids for an engineering, procurement, and construction (EPC) contractor for the 40 MW Otjikoto Biomass Power Station near the town of Tsumeb. NamPower is conducting an open international bidding process for the EPC contract.

The Otjikoto Biomass Power Station will have a generation capacity of 40 MW.

The plant’s configuration can be either as 2 x 20 MWe boilers with a common steam collector leading to a single turbine and generator, or a single 40 MWe boiler, turbine, and generator.

Submission Deadline: 17 November 2023 Namibia.

Bidder Registration Form along with proof of payment to Biomass.procurement@nampower.com.na.

Full details here

 


NDEP Calls for Tenders for a Land Drilling Rig

1.INTRODUCTION

Niger Delta Exploration & Production PLC (NDEP) intends to hire a 1000HP 5KSI Land Drilling Rig for the completion, testing and workover of Land Wells with an anticipated starting date in June 2023 for a firm period of one year plus an extension option for an additional one-year.

NDEP therefore uses this medium to inform suitable and reputable Companies with the requisite experience, a Rig available in Nigeria and resources for the execution of this scope to submit their bids for consideration.

2.SCOPE OF WORK/SERVICE REQUIREMENT

The scope of work will comprise of Completion, Testing, Workover, De-completion, Recompletion and Suspension of Wells in NDEP concession areas OML 53 & 54 (both on Land) on a 24hours/7days basis.

The scope includes;

  • Mobilization from point of Origin to first Well site.
  • Demobilization of Rig from last operational location.

The requested Rig should be fully capable of working in Nigeria Land Operational conditions, with minimum negative impact on the environment and strict compliance to Health and Safety of all stakeholders impacted by the activities.

The Rig shall have a mandatory minimum requirement of the listed basic capabilities and equipment to qualify for consideration:

  • Rig shall be mobilized in Q2-2023
  • Rig Hoisting capacity: 500 Ton minimum
  • Drilling depth capacity with 3 ½’’ DP of 15000 ft
  • Drawwork of 1000HP
  • Rotary Table opening of 37 ½” x 300Ton
  • Top Drive System of 250Ton/WP 7500psi/38,000lb. ft output power.
  • Power capacity of 1000HP
  • 2 x 1600HP Mud pumps
  • Mud storage capacity of 2400bbls with ability for zero discharge facility in line with Nigerian Law and International standards.
  • Cementing lines and Manifold rated 5,000 psi Working Pressure
  • Well Control Equipment – 13 5/8” x 5,000psi BOP stack and accessories

3.MANDATORY REQUIREMENTS

To be eligible for this tender opportunity, interested contractors are required to:

  • Be registered in the NUPRC and NCDMB databases.
  • Indicated their interest through Rigbids@ngdelta.com within two working days of this advert to receive an Invitation To Tender (ITT).

4.NIGERIAN CONTENT

Bidders are invited to express complete understanding of Nigerian Oil and Gas Industry Content Development (NOGICD) Act, 2010 and Insurance ACT 2003, and their willingness and commitment to comply with same.

Consequently, bidders’ submissions shall be evaluated strictly with the minimum evaluation criteria defined in the NOGICD Act.

Bidders shall:

  1. Demonstrate that the entity is a Nigerian indigenous company by providing details of its Ownership Structure including submission of certified true copies of CAC form C02, C07, and its Memorandum and Article of Association.
  2. Provide evidence of completed registration on NCDMB’s NOGIC JQS portal.
  3. Provide a detailed description of the location of in-country committed facilities and infrastructure (assets, equipment, technical office, administrative space, storage, etc.) in Nigeria to support this contract.
  4. Provide a Nigerian Content Plan with detailed description of the role, work scope, man-hours and responsibilities of all the Nigerian companies and personnel that will be involved in executing the work.
  5. Provide evidence of what percentage of its key management positions are held by Nigerians and what percentage of the total work force are Nigerians.
  6. Disclose the overall percentage of work to be performed by Nigerian resources relative to total work volume.
  7. Ensure that all sub-contractors to the Drilling Rig Contractor have valid Category “SS” NCEC for Drilling Services & valid Category “DA” NCEC for other support services such as Catering, Housekeeping etc
  8. In line with the relevant provisions of the NOGICD Act, 2010 and the NCDMB approved rig utilization strategy, the bidder shall demonstrate substantial evidence of utilization and Nigerian ownership of Land Rig or Nigerian-equity acquisition in the nominated LAND RIG or any other drilling rigs (land/swamp, etc.), or provide MOA for a rig owned by a Nigerian 3rd party.  Bidders with NCDMB NC Rig Certification to support equity in or ownership of the rig should submit same as supporting evidence.
  9. Provide evidence of 1% NCDF payments (inclusive of subcontracts) for all past projects executed by the Bidders (and Rig owner) in the Nigerian oil and gas industry.
  10. Submit a detailed training plan which shall provide sustainable training and development (including certifications as applicable) for Nigerians in line with the Human Capacity Development Initiative Guideline of the Nigerian Content Development and Monitoring Board (NCDMB). The training plan shall include contract-specific training and estimated man-hours. Tenderer is required to submit MOA with Oil and Gas Trainers Association of Nigeria (OGTAN) trainers to support their training plan, which shall be 15% of the project Man-hours of 3% of the total contract sum.
  11. Provide a detailed manning organogram for the nominated rig(s) showing that 55% by man-hours of the personnel positions and manning level onboard the nominated rig(s) will be occupied by Nigerian national employees.

NOTE: Non-compliance with Nigerian content requirements & failure to have the Rig in country are FATAL FLAWS

  1. CLOSING DATE

The Bids shall be submitted on the NDEP portal at www.ngdelta.com/ on or before 8th June 2023 being the bid closing date.

  1. ADDITIONAL INFORMATION
  2. This advertisement of a “Tender Opportunity” shall not be construed as a commitment on the part of NDEP, nor shall it entitle Applicants to make any claims whatsoever and/or seek any indemnity from NDEP and/or any of its Affiliates or Partners by virtue of such Applicants having responded to this Advert.

As Rig mobilisation is planned for Q2 2023 and the requirement is for a Light Rig, the Rig must be available in country, ready for mobilisation and the HP range limited to 1000 – 1300HP. Bidders that do not meet these criteria need not tender for this service.

NCDMB Certification of Authorization number: ES/NCDMB/NDPR/ADV/IPPG/180523/PROVISION OF 1000HP LAND DRILLING RIG

 

 


NLNG Calls for EoI & Pre-qual for Supply Chain Management Services

TENDER/ADVERTORIAL

This is not an invitation to tender. The full tendering procedure will be provided to applicants that are successful in the pre-qualification exercise…

Nigeria LNG Limited (NLNG) requires a vendor to provide Supply Chain Management Services (SCMS) to support maintenance and production activities in its Plants in Bonny, Rivers State, Nigeria.

The company hereby invites SCMS providers with all requisite experience, capacity and regulatory permits & licences to express their interest to participate in the tendering for this service.

SCOPE OF THE SERVICE

The Supply Chain Management Services required will include but are not limited to the provision of:

  • Procurement Management services
  • Contract Administration and Management services
  • Inventory Control and Stock Management services
  • Material Management services including Material Handling, Packaging for Export, Heavy Goods Vehide/Forklift Services, Stock Check, Material Preservation & Quality Control
  • Vendor Management services

COMMENCEMENT AND DURATION

The expected date of commencement of the service is 1st February 2024 and the duration will be three (3) years with an option to extend at NLNG’s sole discretion.

PRE- QUALIFICATION

A pre-qualification exercise of interested SCMS providers will be carried out and only successful applicants will be invited to provide a competitive tender for this service.

To be considered for pre-qualification, interested companies are required to submit the following documents for consideration:

  • Valid Certificate of Incorporation and Corporate Affairs Commission (CAC) Forms 2A & 7A (or its equivalent).
  • Tax Clearance Certificates for the past three (3) years i.e., 2019 – 2021 and Nigerian Tax Registration/ldentification Number.
  • Details of relevant verifiable experience of SCMS provision that has been undertaken as main contractor over the past five (5) years.
  • Valid Nigerian Midstream and Downstream Petroleum Regulatory Authority (NMDPRA)/DPR permit(s).
  • Valid Federal Ministry of Labour and Employment Recruiter’s licence
  • Acknowledgment of willingness to undergo NLNG and Third-Party audits.
  • Confirmation of willingness to operate in strict accordance with the NLNG Business Principles.
  • Any additional information that will enhance the potential of the company

 

NIGERIAN CONTENT

NLNG is committed to the development of the Nigerian Oil and Gas business in accordance with the Nigerian Oil and Gas Industry Content Development Act 2010 (NOGICD Act).

Interested companies must comply with all the provisions of the NOGICD Act that relate to this service and in particular comply with the minimum Nigerian content percentage for ownership (i.e., 51% and above) and in relation to the scopes of service as provided in the Schedule to the NOGICD Act 2010.

Failure to fully comply with the NOGICD Act 2010 or demonstrate commitment to Nigerian content development policy of the Federal Government of Nigeria and NLNG shall result in outright disqualification from the tender process for this scope of services as described above.

As part of their submissions, companies signifying interest by responding to this advertisement shall submit acknowledgement of willingness to comply with the Nigerian Content Act.

General Nigerian Content Requirements

Companies responding to this advertisement are required to submit the following in compliance with the Nigerian Oil and Gas Industry Content Development Act, 2010:

  1. Documentation to demonstrate that the entity is a Nigerian-registered company. Submission of certified true copies of CAC Forms 2A & 7A (or its equivalent) including company Memorandum and Article of Association. All companies shall be Nigerian Indigenous Service Companies having 51% and above Nigerian equity in the shareholding and ownership structure of tenderer’s legally registered entity in Nigeria by CAMA (Companies and Allied Matters Act).
  2. Evidence of registration on the Nigerian Content Development Monitoring Board (NCDMB) NOGIC Joint Qualification System (JQS).
  3. Evidence of valid Nigerian Content Equipment Certificate (NCEC) in the relevant category.
  4. The process and procedure that explain the methodology of how it intends to comply with the requirements of the NOGICD Act 2010 (Nigerian Content Plan) and how to achieve the set target(s) in the schedule of the NOGICD Act and any targets set by the Board.
  5. Details of the company’s corporate organisations overall Human Resources structure (management, supervisors, senior and junior skilled officers, etc.), identifying positions manned/occupied by Nigerian nationals with evidence of type of employment in-country and identifying the positions manned/occupied by other nationals.
  6. Proposed organogram for this work scope populated with nationality, qualifications of personnel and years of experience of personnel on the job (attach CV of key finance, operational and technical personnel) including a succession plan in this work scope.
  7. A detailed description of the location of facilities and infrastructure (assets, equipment, technical office, and administrative space, storage, etc.) in Nigeria to support this contract, evidence that 50% of all equipment deployed to work by multinational and international companies are owned by the local subsidiaries.

SUBMISSION OF RESPONSES

Submissions in response to the above requirements shall be completed strictly in accordance with the instructions given in this publication, segregated and arranged in the order indicated.

Failure to submit any of the documents may result in the disqualification of the applicant.

 

The Expression of Interest document should be submitted:

In electronic copy in PDF format by e-mail to: eoi.scms@nlng.com with “CONFIDENTIAL Expression of Interest and pre-Qualification for Provision of Supply Chain Management Services (SCMS) for Nigeria LNG Limited” in the

subject line.

The submission must be received by NLNG no later than 16th February 2023. Please Note:

  • This is not an invitation to tender. The full tendering procedure will be provided to applicants that are successful in the pre-qualification exercise which will be carried out in accordance with NLNG’s relevant procedures.
  • Notwithstanding the submission of an Expression of Interest, NLNG is neither committed nor obliged to indude any company and/or its associated companies, agents or subcontractors on any bid list or award any form of contract to any company and/or its associated companies, agents or sub-contradors.
  • This advertisement for Expression of Interest and Pre-qualification shall not be construed as a commitment by NLNG, nor shall it entitle respondents to daim any indemnity from NLNG or its affiliates by virtue of having responded to this advertisement.
  • This Expression of Interest is a simple invitation for interested vendors to express interest in providing the indicated services and does not warrant any further feedback from NLNG hereafter.
  • If you do not hear from NLNG within 3 months of submission of this publication, it should be taken that your application was not successful.

Signed:

MANAGEMENT

Nigeria LNG Limited

 

 


NIGERIA: Request for Qualification (RFQ) for the concession of the 700MW Zungeru Hydropower dam

PRODUCT OR SERVICE BEING SOUGHT:

Invitation for Submission of Request for Qualification (RFQ) for the Concession of the 700MW Zungeru

Hydroelectric Power Plant (ZHPP)

The Federal Government of Nigeria (FGN) through the National Council on Privatization (NCP) and its

Secretariat, Bureau of Public Enterprises (BPE) in conjunction with the Federal Ministry of Power

(FMOP), invites interested investors to express interest by submitting their Request for Qualification

(RfQ) for the concession of the Zungeru Hydroelectric Power Plant (ZHPP).

The strategic objective of the 700MW Zungeru Hydroelectric Power Plant at Zungeru, Niger State, is the need for increased electricity generation from diverse sources, particularly, from the hydroelectric potentials replete in Niger State.

This is with an overall objective to procure a concessionaire with the Technical and Financial capabilities

to operate, maintain and manage the Zungeru Hydroelectric Power Plant through professional and

efficient management practices for a minimum of thirty (30) years.

The Bureau of Public Enterprise (BPE) is seeking competent investors as concessionaires to

operate, manager and maintain the hydropower plant for 30 years. The Plant comprise a reservoir with

230-meter elevation, powerhouse containing four 175 MW turbine/generating units for a 700MW total

rated output. Project is expected to be commissioned in 2023.

Full details here.


TUNISIA: Calls for Tenders for Solar and Wind Projects Totaling 1,700MW

PARTNER CONTENT

Three calls for tenders for the development of solar and wind projects over 2023-2025 with a total capacity of up to 1.7 GW TUNISIA

  • Organization Name: The Tunisian Ministry of Industry, Energy and Mines
  • Organization Type: National Government
  • Tunisia issued the following three calls for tenders: 1 – Call for Tenders # 01-2022 for Photovoltaic Power Projects as follwos:

The Ministry of Industry, Mines and Energy (the Ministry) intends to select eight (8) power generation projects from photovoltaic solar energy of 100 Mega Watts (MW) each in four (4) rounds over 2023-2025 as the following:

  1. Round #1: 2 Photovoltaic Power Plants of 100 MW each with a submission deadline on Thursday, June 15, 2023 at 12:00 p.m. Tunis time.
  2. Round #2: 2 Photovoltaic Power Plants of 100 MW each with a submission deadline in March 2024.
  3. Round #3: 2 Photovoltaic Power Plants of 100 MW each with a submission deadline in November 2024.
  4. Round #4: 2 Photovoltaic Power Plants of 100 MW each with a submission deadline in September 2025.

The Ministry is inviting interested bidders to submit offers for the implementation of solar photovoltaic concession pro jects on sites suggested by bidders. In order to receive tender documents and additional information by email, interested bidders must register on inscription AO 01-2022.

2- Call for Tenders # 02-2022 for Wind Power Projects

The Ministry of Industry, Mines and Energy (the Ministry) intends to select eight (8) power generation projects from wind energy of 75 Mega Watts (MW) each in four (4) rounds over 2023-2025 as the following: Round #1: 2 Wind Power Plants of 75 MW each with a submission deadline on Thursday, September 14, 2023 at 12:00 p.m. Tunis time.

Full details here.


Ghana Calls for Tender for Seismic Acquisition in the Tano Basin

TENDER

All questions related to this request to pre-qualify process are to be sent to tender@gnpcghana.com

The Ghana National Petroleum Corporation (GNPC), is inviting applications for pre-qualification from internationally reputed geophysical service providers to carry out the Acquisition and Processing of 1200 sq.km of 3D Marine Seismic data over the GH-WB-01 block offshore Ghana.

The activity is set to commence in the Second (Q2) or third (Q3) quarter of 2023 and should span a period of not more than fourteen (14) months. The GH-WB-01 Block is in the Tano Basin offshore Ghana. The block has both transition and shallow water zones, with water depths ranging from 0-150 meters. The proposed seismic is in the western portion of the block where minimum water depth is approximately 30 metres.

Two major gas pipelines; the Ghana Gas and OCTP gas pipelines transit the block. Design and Acquisition of data: The Corporation will provide tentative Acquisition and Processing parameters.

Submission of Application for Pre-qualification

Duly completed Pre-qualification document in plain sealed envelopes clearly marked: “Pre-qualification for the Acquisition and Processing of 1200 sq.km Full Fold High Resolution 3D Marine Seismic Survey in the GH-WB-01 Block” Four hard copies and one soft copy on pen drive of the completed Request to Pre-qualify documents and other requested information shall be referenced and addressed to: THE CHIEF EXECUTIVE, Attn: HEAD OF SUPPLY CHAIN. GHANA NATIONAL PETROLEUM CORPORATION, 4 TH FLOOR DENNIS HOUSE (SUPPLY CHAIN DEPARTMENT) PMB TEMA, GHANA.

Completed Pre-qualification documents should be submitted to GNPC on or before 10:00 AM GMT, November 08, 2022. Late submissions shall be rejected and returned unopened to the applicants. All questions related to this request to pre-qualify process are to be sent via the email address listed below, before 28th October 2022. Email: tender@gnpcghana.com

The details of the international competitive tendering are in the link.


Morocco Calls for Expressions of Interest for EPC for Seven Solar Parks totalling 260 MW

The Moroccan Agency for Sustainable Energy (MASEN) has launched a call for expressions of interest for the signing of engineering, procurement, construction (EPC) contracts for seven solar photovoltaic plants with a combined capacity of 260 MW.

Procurement engineering and construction (EPC) service providers have until 30 October 2022 to apply.

The European Investment Bank (EIB) is financing the programme to the tune of €129Million.

The seven solar photovoltaic plants are divided into two lots and they are part of its Noor Atlas solar programme.

The first (larger) one is for the construction of five plants in Ain Beni Mathar (42 MW) and Bouanane (30 MW) in the Oriental region, in Outat el Haj (36 MW) and Enjil (42 MW) in the Fez-Meknes region, and in Boudnib (36 MW) in the Drâa-Tafilalet region.

The second is the Tan-Tan solar photovoltaic plants in the Guelmim-Oued Noun region and the Tata plant in the Souss-Massa region. The two solar parks will each have a capacity of 36 MW.

Morocco’s Law 38-16 provides for the transfer of the renewable assets of the National Office of Electricity and Drinking Water (ONEE) to MASEN. It is within this framework, that the call for tenders launched today by MASEN will enable the selection of the constructor(s) (EPC) from among the eight pre-qualified companies/consortiums”, the Moroccan public body states.

Companies interested in MASEN’s call for expressions of interest have until 30 October 2022 to submit their bids. The Noor Atlas programme implemented by Onee aims to develop solar energy in remote areas of Morocco, in line with the kingdom’s objective of increasing the share of renewable energy to 52% by 2030.

The EIB says the Noor Atlas solar programme will help to reduce energy dependence on fossil fuels. The construction of this infrastructure will also create new jobs in a very dynamic sector. Above all, the programme will enable Morocco to diversify its electricity mix. According to MASEN, this North African kingdom has an installed capacity of 10,627 MW. Only 37% of this capacity comes from renewable sources, i.e. 3 934 MW.

To access the tender, click here.

 

 

© 2024 Festac News Press Ltd..